Drain Slope and P-Trap Problems Behind the Wall

One quarter inch of fall per foot is the number, and a drain that misses it by half is the difference between a clear line and a slow one. The intervals bath remodel riverside inside michigan politics uses are shorter than the manual says for checking a drain, since a remodel in Riverside, CA is the one time the whole run sits open to a level and a flashlight.
Slope is checked with a level, not a guess

Once the vanity and the shower pan are out, the horizontal drain run shows from the trap arm to the wall tee. A four foot level with a shim under the low end tells the story at once. A run that bellies, where the pipe sags between hangers, holds a puddle of waste that grows slime and sends odor up the line. Sagging plastic is strapped or replaced, and cast iron that has lost its hub joint is cut out and coupled with new fittings.
The P-trap, the one fitting that matters most

The trap holds the water seal that keeps sewer gas out of the room. Old chrome traps under the vanity corrode through at the bottom and weep slowly into the cabinet floor. A tub trap hidden under the floor may be lead or galvanized and has to be reached from below. The crew checks the trap for pinholes, for a loose slip nut and for the right height, because a trap set too low or too high will siphon dry or drain slowly.
Venting and the smell behind it
A sewer smell in a bathroom is often a venting problem, not a drain problem. A vent that was cut during an old remodel, or capped in the attic, lets the trap siphon every time someone drains the tub. The crew traces the vent line up through the wall, checks it for joints that never got glued, and sets new tees where the old ones were reversed. The vanity drain and the tub drain each need their own path to open air.
Framing damage that follows a leak
Where a drain has leaked for years, the bottom plate and the subfloor around it are dark and soft. The shower base area suffers most, since the drain tailpiece sits right in the wet zone. Rotted framing is cut back, replaced and treated, and the drain is reset to the correct height in the new subfloor. Any mold on the back of the wall is cut out with the drywall that carries it.
Flood testing before anything is covered
New drain work gets a flood test. The line is plugged, filled and left standing. A level that drops means a bad joint, and a level that holds means the line can be covered. Only then does the waterproofing membrane and the tile go on, and the P-trap stays reachable through the vanity base for any later call.